VISTA-250FBP (3/17/2003) 13850 - 12
Detection and Alarm
4. Electromagnetic Interference The system shall meet or exceed the
requirements of FCC Part 15, Class B devices, FCC Part 68, IEC EMC
directive.
PART 3 EXECUTION
3.01 EXAMINATION
A. Submission of a proposal confirms that the Contract Documents and site
conditions are accepted without qualifications unless exceptions are specifically
noted.
B. The site shall be visited on a regular basis to appraise ongoing progress of other
trades and contracts, make allowances for all ongoing work, and coordinate the
requirements of this contract in a timely manner.
3.02 INSTALLATION
A. The System shall be installed and tested in accordance with the Manufacturers
Installation instructions. The following conditions are applicable:
1. In order to ensure a complete, functional System, for bidding purposes,
where information is not available from the Owner upon request, the worst
case condition shall be assumed.
2. Interfaces shall be coordinated with the Owners representative, where
appropriate.
3. All necessary backboxes, pullboxes, connectors, supports, conduit, cable,
and wire shall be furnished and installed to provide a complete and reliable
System installation. Exact location of all boxes, conduit, and wiring runs
shall be presented to the Owner for approval in advance of any installation.
4. All conduit, cable, and wire shall be installed parallel and square with
building lines, including raised floor areas. Conduit fill shall not exceed
forty percent (40%). All wires shall be gathered and tied up to create an
orderly installation.
3.03 TESTING AND CERTIFICATION
A. The Contractor shall demonstrate the functionality of the System upon completion
of installation, documenting the result of all tests and providing these results to the
Owner. The System shall be tested in accordance with the following:
1. The Contractor shall conduct a complete inspection and test of all installed
equipment. This includes testing and verifying connection to equipment of
other Divisions.